Temperature and other process readings confuse many operators because two different ideas get mixed together: statutory requirements in O. Reg. 31/05 and plant-defined operational limits in the written manufacturing control program. Good records keep those distinctions visible.

What is the difference between a regulatory requirement and a plant operational limit?

A regulatory requirement is set by O. Reg. 31/05 or MPG — for example refrigeration equipment requirements under s. 30 and daily pre-op temperature recording under s. 47(6.1). A plant operational limit is a threshold the plant defines in its written program for a specific process control — smokehouse humidity, cooler alarm setpoint, or cooking end-point — which may be stricter than the regulation but is not itself the regulation.

Regulatory temperatures vs process controls

  • Regulatory: O. Reg. 31/05 s. 30 sets refrigeration/freezing equipment obligations; s. 47(6.1) requires recording those temperatures during daily pre-op.
  • Plant-defined: manufacturing or process controls in the written program — cooking times, cooler monitoring between pre-ops, pH checks, sanitizer concentration, or other metrics the plant monitors on a defined frequency.
  • Software should record readings against the plant's configured limits while preserving which regulatory requirement, if any, a control supports.

Reading → outside limit → response → retest → corrective action

  1. Record the reading at the time it is taken on the operating day.
  2. Mark deviation when the reading is outside the plant's configured limit (or regulatory threshold where directly monitored).
  3. Document immediate response — hold product, adjust equipment, re-clean, notify supervisor.
  4. Retest or re-read when the program requires verification before resuming.
  5. Open corrective action when the deviation indicates a systemic issue requiring assigned follow-up and separate verification.
  6. Preserve the original reading; do not silently overwrite the first value.

Pre-op temperature is not the only temperature record

Daily pre-op captures required refrigeration/freezing readings before production. Separate process controls may monitor the same or other equipment on hourly, per-batch, or other frequencies defined by the plant program.

Illustrative process control reading (not a prescribed form)

  • Control name and process area
  • Operating date and time recorded
  • Reading value and unit
  • Within plant limit (yes/no)
  • Immediate response when outside limit
  • Retest reading and time
  • Corrective action reference if opened
  • Person recording

Limits come from the plant's written program. InspectionDay compares readings to configured plant limits — it does not certify compliance with Ontario law.

What an inspector may ask for later

Pre-op temperature records, process control logs for the requested period, evidence of response and retest when readings were outside limits, corrective actions with verification, and the written program showing how limits were established.

InspectionDay separates regulatory-linked controls from plant-defined limits and keeps deviation, retest, and corrective-action history on one timeline.

See process controls in InspectionDay

Common questions

Does InspectionDay set my temperature limits?
No. Limits are configured from the plant's written program. InspectionDay records readings, flags deviations against those configured limits, and preserves follow-up history.
What if a reading is outside the plant limit but inside the regulation?
The plant should follow its written program — which may require action at stricter internal limits even when a statutory minimum is different. Document the response either way.

Official sources

Reviewed against primary Ontario and Alberta government sources. InspectionDay does not determine regulatory compliance.

  • O. Reg. 31/05, Meat

    Source verified in dataset: 2026-08-10

    View official source
  • MPG Part 6 — Operation of meat plants

    Reference: Part 6

    Source verified in dataset: 2026-08-10

    View official source
  • Ontario Meat Plant Guidelines

    Source verified in dataset: 2026-08-10

    View official source

Related guides

  • Ontario Meat Plant Pre-Operational Inspections: Records and Corrective Action
  • When an Ontario Meat Plant Check Fails: Corrections, Corrective Action, and Records
  • Ontario Meat Plant Requirements: What Provincial Operators Need to Know
  • Ontario Meat Plant Inspection Readiness: Organizing Records for Review
  • All Ontario guides

Explore InspectionDay for Ontario

Process control readings, deviations, retests, and corrective actions on Ontario profiles.

See process controls in InspectionDayRequest pilot

InspectionDay

InspectionDay is independent software and is not affiliated with or endorsed by the Government of Ontario or the Ontario Ministry of Agriculture, Food and Agribusiness.

  • Product
  • How it works
  • Guides
  • Ontario requirements
  • Pricing
  • Apply for a pilot
  • Sign in

© 2026 InspectionDay. Ontario provincially licensed meat plants.